Expertise · Before you start

Prepare everything needed before starting the website project.

A website project is not delayed due to complex design. It is delayed due to a lack of input from your side.

Quick summary

Before starting, finalize three groups: goals and target customers, content materials and brand identity, and the person with approval authority along with technical access rights. The most commonly missing part is the actual content and the person with sufficient decision-making authority on your side.

Quick comparison
You should choose this direction when
  • has clear goals and target customers
  • has content, images, and brand identity
  • has appointed someone for approval and has technical access rights
Not needed when.
  • lack of real content, using placeholder text instead
  • no one has the authority to make decisions on the client's side

The question that business owners often ask when preparing to create a website is not "how to design it" but "what do we need to prepare before starting?" The answer can be summarized in three groups: goals and target audience, materials, and decision-makers. If one group is missing, the project will be delayed. If two groups are missing, the project will need to be redone.

Group one: Goals and audience

Before discussing design or technology, answer two questions: what does this website do, and who is it doing it for?

  • Specific objective: What do you want customers to do after visiting the page? Submit a contact form, call, make a purchase, or read more to gain trust? A website cannot serve well without a clear prioritized action.
  • Customer portrait: Who are your customers, what are they concerned about, and what factors do they base their decisions on? A website built from a deep understanding of specific customers will anchor all future design decisions. Without that anchor, each review round will depend on subjective feelings.

You don't need a lengthy document. Just ensure that you and the design team agree before starting the design.

Group two: Content materials

This is the most commonly overlooked group and also the number one reason projects drag on. Designing around an empty frame leads to multiple revisions when the actual content appears later.

  • Text: Service descriptions, brand stories, explanations for each main page. You can write it yourself or seek assistance from a writer, but the raw materials (product information, differentiators, policies) must come from you.
  • Images: Product photos, space images, team photos, or process images. Real images of the business are often more powerful than purchased stock photos.
  • Evidence of trust (social proof): Customer reviews, partner logos, real numbers from actual results. This is the part that builds trust and should not be left empty.
  • Brand identity: Original logo, color palette, typography, writing style. If the identity is not stable, the website will need to be updated after completion.

Group three: Decision makers and access rights

This is something few think about initially, but lacking it will cause bottlenecks at the most critical stages.

  • A decision-maker: The project needs one person on your side who has the final say for each review round. When multiple people provide input without anyone making the final decision, the review process can drag on indefinitely.
  • Technical access rights: The domain and website hosting are usually held by you or the IT department. The implementation unit needs to be granted access rights in a timely manner to launch the site on schedule.
  • Analytics tools: If you want to measure effectiveness after the website goes live, you need to prepare a Google Analytics account or equivalent. This is a tool for measuring traffic and user behavior.

When to start, when to hold back

Enough to get started: You have clear goals and know who your customers are. There is rough content for the main pages. The brand identity is stable. You have appointed someone with the authority to approve and manage access to the domain and hosting. Should prepare more beforehand: There is no real content yet, using placeholder text. No one has the authority to make decisions, and each approval round requires consulting many people. The identity is still changing. It is unclear who holds the domain account.

Common errors and how to avoid them

  • Use placeholder text to start: Designs look good with placeholder text, but when real text is added, the layout breaks and needs to be redone. Have at least rough content for the homepage and service pages before starting on the interface.
  • No designated approver: Each review round has three or four different opinions from internal parties. This is a common reason for projects to be delayed compared to the original schedule.
  • Forgetting to grant access rights: Many projects are completed but cannot go live because no one can be found who holds the domain account. Be sure to check and record this information early.

A website project runs on time not because the team works quickly. It runs on time because the inputs were sufficient from the start.

Practical experience.

Which parts can be outsourced and which cannot

A design unit can help clarify content goals and strategies during the exploration phase, and can write content based on the real materials you provide. However, the raw materials, product information, evidence of trust, and the final approver must come from you. This is the part that no one can do for you, and it is also the part that determines whether the project stays on schedule.

The tool brings back.

Decision checklist

Topic: What preparations are needed before creating a website. Sinh Vũ guide, sinhvu.com

0 more than 7 items

Select each item you find appropriate, then print or save as PDF to take with you.

Sign indicating that you should take action
Questions to answer before deciding

If you have marked most of the signs above, this is the time to discuss in more detail. Sinh Vũ can help you review and propose a direction.

References

Sinh Vũ P1 phases & deliverables (P1.json); Sinh Vũ Brief 10 steps (p1-website.md). Practical experience from brand design and operations projects at Sinh Vũ Studio.

Frequently asked questions

Can you start the project without content?

You can start simultaneously, but it is important to clearly determine whether you will write the content yourself or seek assistance from a writer. If the design progresses before the real content is available, it is almost certain that it will need to be redesigned when the actual text and images appear. A safer approach is to have at least rough content for the main pages before entering the interface design phase.

What if the brand identity is not complete?

This is a point that needs to be agreed upon before creating the website. If the logo, colors, or fonts are still changing, the completed website will need to be fully updated. The two common approaches are to stabilize the identity first or to develop the identity and website simultaneously within the same project to maintain consistency. The second approach is only suitable when there is someone clearly maintaining standards for both tasks.

When should technical access be prepared?

As soon as possible. The domain name and hosting are usually held by you or the IT manager. Many projects get stuck at the final stage because they cannot access the domain account to point to the new server. Therefore, it is advisable to list from the very first brief what permissions are necessary and who holds them.