Expertise · Boundaries of roles

Sinh Vũ designs or handles both execution.

Many clients confuse design with execution. This page clearly explains where Sinh Vũ fits in the chain of an event project and POSM.

Quick summary

Sinh Vũ takes on the role of design and art director, not as an event organizing company. Printing, staging, and logistics are handled by workshops and contractors within the partner network, while Sinh Vũ provides the standard template files, checks the color of the actual print samples, and supervises to ensure the site matches the design. If you need a unit to handle the entire script, sound, lighting, talent management, and performance metrics, that is the responsibility of the event organizing company, not part of what Sinh Vũ takes on.

Quick comparison
You should choose this direction when
  • need to ensure brand-appropriate visuals from concept to on-site
  • A construction network is already in place or ready to be used.
Not needed when.
  • need a unit to handle complete operations: MC, sound and lighting, talent management
  • only a few quick print items are needed; no art direction required

Sinh Vũ receives this question frequently, especially from clients organizing large-scale brand events for the first time. The short answer: Sinh Vũ is the creative director and visual production supervisor, not an event organizing company. This boundary is not a limitation of capability but a proper division of roles, similar to how an architect creates design intent while a contractor handles production drawings and actual construction.

Sinh Vũ stands where in the project chain

In an event project with POSM (point-of-sale and event communication materials), the workflow is typically divided into three layers: visual intent, physical production, and on-site operations. Sinh Vũ handles the first layer and extends into the beginning of the second layer in the quality control section.

  • Design and creative direction: Concept, event identity system, layout for each POSM item, and standard die files for production.
  • Production direction: Color check of the actual print sample before running the quantity, review the contractor's shop drawings to confirm the intent, supervise the visual setup on-site.
  • Do not accept: Signing contracts for construction, managing personnel for staging, coordinating program operations, committing to attendance metrics, MC scripts, sound and lighting, talent management.

Why separating the two roles is essential

The design party is responsible for intent and standards. The execution party is responsible for fabrication dimensions, methods, installation, along with insurance and legal responsibilities on site. The AIA A201 construction contract clearly states that the contractor is responsible for the fabrication drawings, while the design party only checks to see if it aligns with the intended design. Merging these two roles into one unit often leads to conflicting responsibilities when issues arise: who is responsible when the stage structure does not meet load requirements, or when colors are off because the workshop adjusted printing parameters on their own?

Sinh Vũ maintains this boundary to protect both sides. You know exactly who is responsible for what, avoiding the blame game when issues arise.

When to need to coordinate with another unit

Only need Sinh Vũ: You already have a familiar printing workshop and contractor, just ensure brand-appropriate visuals from concept to print file and supervise on-site image quality.

Need additional coordination: The project lacks a workshop and contractors, or there are multiple construction areas that need logistical coordination, or the program requires a script, MC, sound and lighting, and talent management. Sinh Vũ can introduce partners within the network, but contracts for execution and organization are signed separately with each unit.

Common errors when boundaries are unclear

  • Thinking that hiring a designer means someone will set up the stage and handle logistics, only to discover close to the date that there is no contractor.
  • Allowing the contractor to decide on colors and ratios when printing, with no one maintaining brand standards, results in a mismatch with the identity system on-site.
  • Expecting Sinh Vũ to commit to operational metrics, such as the number of attendees or activation effectiveness (brand activation at touchpoints), while these are metrics of the organization and communication, not design.

The design party is responsible for intent and standards. The execution party is responsible for fabrication dimensions, methods, installation, and safety on site.

Reference: AIA A201 General Conditions of the Contract for Construction, NYSED Shop Drawings and Delegation

The viewpoint of Sinh Vũ

The Sinh Vũ excels at ensuring that the brand image remains intact when transitioning from screen files to actual printed materials and on-site. This is a step that many projects overlook, thinking that simply delivering the files to the workshop is sufficient. In reality, the print colors on hiflex fabric, PVC foam, and acrylic (common printing materials in event POSM) yield different results and require someone experienced to check each sample before running the quantity.

Sinh Vũ's supervision of the setup on-site is not to ensure the contractor follows construction techniques correctly, but to confirm the ratio, position, and lighting on the printed surface align with the brand's intent. These two tasks are different, and each side needs the right expertise to take responsibility.

The tool brings back.

Decision checklist

Topic: Does Sinh Vũ only design or also handle execution and event organization? Sinh Vũ handbook, sinhvu.com

0 more than 6 items

Select each item you find appropriate, then print or save as PDF to take with you.

Sign indicating that you should take action
Questions to answer before deciding

If you have marked most of the signs above, this is the time to discuss in more detail. Sinh Vũ can help you review and propose a direction.

References

Sinh Vũ R3 service profile (internal document). NYSED, Shop Drawings, Submittals and Delegation, referencing AIA A201 General Conditions of the Contract for Construction.

Frequently asked questions

Can Sinh Vũ recommend printing workshops and staging contractors?

Yes. Sinh Vũ works with a network of partners including printing houses and contractors familiar with color-checking processes and file delivery. Sinh Vũ can introduce or coordinate directly within the project; however, the construction contract is still signed separately between you and the contractor, not included in the design fee.

If color discrepancies occur on-site, will Sinh Vũ take responsibility?

Sinh Vũ is responsible for the files and color standards that have been approved on the actual print sample before mass production. If color discrepancies occur after the sample has been approved and the workshop adjusts the printing parameters without notification, that responsibility lies with the workshop. Therefore, the process of color checking the actual sample before running the quantity is a step Sinh Vũ strictly maintains in all projects.

Does Sinh Vũ accept scriptwriting for programs or MC content?

No. Program scripts, MC content, talent management, and on-site coordination are outside the scope of Sinh Vũ's services. Sinh Vũ focuses on the visual aspect, from concept to print files to on-site supervision regarding brand imagery.

← Back to POSM and events