The answer depends on one thing: does your event have a live program.
If the event is just a static display space, Sinh Vũ can coordinate the printing workshop and staging contractor without needing an additional organizing unit. But when the event has an MC, performances, sound and lighting, or manages a large number of guests, you still need a separate operational unit because that is part that Sinh Vũ does not handle. These two roles do not replace each other; they complement each other.
Once you have signed a contract with Sinh Vũ to design POSM (point-of-sale and event materials) and set up the space, the next question naturally arises: do you need to hire an event management company as well? The answer is not a fixed "yes" or "no" but depends on the nature of your event.
This industry divides work into three clear groups. Understanding these three groups correctly helps you assign roles from the start and avoid incorrect expectations.
A unit skilled in one role does not automatically excel in another. Expecting Sinh Vũ to also take on a third role puts both parts at risk.
There are cases where you can work solely with Sinh Vũ without needing an additional organizing unit, specifically when:
In this situation, Sinh Vũ coordinates with the printing workshop and the contractor to supervise the construction according to the visual intent. You only need one internal contact to host clients and handle minor issues.
When an event has a live program, the equation changes completely. You need a separate organizing unit when any of the following factors are present:
Sinh Vũ encounters two recurring mistakes in projects involving events:
Sinh Vũ collaborates alongside organizing units in many projects. Both parties maintain their roles without overlapping. Sinh Vũ is responsible for ensuring the event reflects a specific brand, rather than a generic event with a logo attached. As for who holds the microphone, who controls the lights, and who arranges guests at tables, that is not within Sinh Vũ's scope and is not guaranteed.
When three or more work groups must coordinate simultaneously, a clear coordinating point is needed; otherwise, the project owner may inadvertently become a reluctant project manager.
Industry practice in general contractor and specialized contractor roles
If you are uncertain which category your event belongs to, the simplest way is to list all the tasks that require someone to be responsible on the day of the event. Any task without a designated person is a gap that needs to be filled first.
Topic: If Sinh Vũ has been hired for design, is an event organization company still necessary. Sinh Vũ guide, sinhvu.com
Select each item you find appropriate, then print or save as PDF to take with you.
If you have marked most of the signs above, this is the time to discuss in more detail. Sinh Vũ can help you review and propose a direction.
Sinh Vũ R3 service profile (internal document); Reliable General Contracting, General vs Specialty Contractor (practices for general contractor and specialty contractor roles).
Sinh Vũ coordinates contractors to ensure the execution aligns with the design, meaning supervising the physical elements being constructed according to the visual intent. This is different from event operations: managing the timeline, coordinating the MC, managing talent, and handling program issues on the event day. Sinh Vũ does not take on the latter, so if the event has a live program, an additional organizing unit is still needed.
The biggest risk is that no one is managing the timeline when everything happens at once. Business owners often become reluctant coordinators, juggling client meetings while messaging each contractor, resulting in shortcomings in both design and operations. For small, static events, the internal team can manage. For events with a program and many guests, neglecting this coordination role is a real risk.